Environment

When it comes to protecting the marine environment, we make every effort to ensure that each operator working in the Canada-Nova Scotia offshore area has taken all necessary steps to demonstrate how they will carefully and responsibly perform offshore activities to avoid or minimize negative impacts to the environment.

Environmental Assessment

Environmental Assessments (EAs) are governed by both the Federal and Provincial Accord Acts and the Impact Assessment Act. The nature of the proposed offshore program will dictate which regulatory stream proponents are to follow for EA preparation. 

Part III of the Accord Acts promotes environmental protection in the Canada-Nova Scotia offshore area, and includes the requirement for an EA for offshore petroleum activity authorizations for exploration and development programs. The Impact Assessment Act applies specifically to “designated projects” as defined by that Act, and the Physical Activities Regulations pursuant to that Act. Under this Act, the following programs require a federal Impact Assessment (IA) and are primarily overseen by the Impact Assessment Agency:

  • the drilling, testing and abandonment of offshore exploratory wells in the first exploration drilling program in an exploration licence;
  • petroleum development programs; and
  • some decommissioning programs.

For those activities requiring an IA under the Impact Assessment Act, the CNSOER typically accepts the IA as fulfilling this Accord Acts authorization requirement. All other EAs are primarily overseen by the CNSOER. This includes EAs for the following types of programs:

  • geophysical and geotechnical programs, including seismic surveying;
  • exploration drilling programs that take place subsequent to the first drilling program within an exploration licence; and
  • some decommissioning programs.

These processes predict effects of proposed physical activities before they begin. The process identifies potential effects, proposes measures to mitigate adverse effects, and predicts significant adverse effects after mitigation measures and follow up programs have been implemented by operators.  Follow-up programs are common, and verify the accuracy of predictions and the effectiveness of mitigation measures specified in the EA/IA.

Strategic Environmental Assessment

Strategic Environmental Assessments (SEAs) have been prepared by the CNSOER and include an overview of the environmental information in a study area surrounding the parcel areas. It is recommended that the information within SEAs be used by operators to assist in the preparation of project specific environmental assessments. "The Strategic Environmental Assessment of the Middle and Eastern Scotian Slope and Sable Island Bank Areas" is particularly relevant to the petroleum-related Call for Bids NS25-1P parcels and is available here.

Environmental Considerations

Parcels 9, 10, 11 and 12 are near Sable Island National Park Reserve. No exploration activities can occur on or within one nautical mile (or 1.85 kilometers) of the Sable Island National Park Reserve. Sable Island is critical habitat for Species at Risk Act (SARA) including listed bird species such as the Roseate Tern (endangered) and the Ipswich Sparrow (special concern). Sable Island is home to a free roaming wild horse population as well as the world’s largest breeding colony of grey seals.  Sable Island is also a Migratory Bird Sanctuary designated under the Migratory Birds Convention Act.

Three parcels (Parcel 8, 9 and 10) are adjacent to the Oceans Act protected Gully Marine Protected Area (MPA). The Gully is a critical habitat for the endangered Northern bottlenose whale and contains biodiverse habitats of deep water corals and sponges.

The eight deep water parcels (Parcels 1 to 8) are located on the Scotian Slope. The Scotian Slope includes migration and transit routes for a number of whale species at risk including, but not limited to the Blue Whale, North Atlantic Right Whale and the Northern Bottlenose whale.

The downloadable map below shows the special areas in the vicinity of the petroleum-related Call for Bids NS25-1P parcels.

Portions of the petroleum-related Call for Bids NS25-1P parcels are known to have year-round or migratory presence of a number of species with protections under the SARA, which is enforced by the Department of Fisheries and Oceans Canada (DFO) and Environment and Climate Change Canada (ECCC). These include, but are not limited to: Blue Whale, North Atlantic Right Whale, Fin Whale, Leatherback Sea Turtle and the White Shark.

Project specific EAs/IAs will be required to address the potential for interaction with species at risk. Bidders are strongly encouraged to gain an understanding of the SARA. SARA and the associated species’ registry are available here.

Indigenous Communal Commercial and commercial fisheries occur in the area. Most fishing is concentrated on the shallower areas of the shelf break. Shellfish species fished for here include scallop, clam, shrimp, quahog, crab, as well as cod, halibut, flatfish, haddock and hake and other ground fish. There are longline fisheries for large tuna, swordfish and shark in deeper waters on the Scotian Slope and Rise.

Other ocean users in and around the parcel areas include commercial shipping, scientific research and military activity.

From 1992 to 2018, three offshore development projects operated successfully adjacent to the Sable Island National Park Reserve, and in proximity to the Gully MPA, with no significant environmental effects.

The Cohasset-Panuke (light oil production) operated from 1992 to 1999. The Sable Offshore Energy Project (natural gas production), operated from 1999 to 2018 and the Deep Panuke (natural gas production) operated from 2013 to 2018. It is believed there may have been a positive environmental effect from these projects - a reef effect on abandoned infrastructure where no ocean life had settled previously.

There were several environmental mitigation measures required during these operations to avoid any significant adverse environmental effects, including but not limited to:

  • Offshore waste treatment guidelines to be rigorously followed, including daily and monthly monitoring and reporting for all overboard discharge;
  • Chemicals for use had to be selected following national criteria;
  • Daily checks to be conducted for any stranded birds and follow-up with Canadian Wildlife Service when applicable;
  • Water quality monitoring at multiple distances from the platforms;
  • Air quality monitoring from Sable Island;
  • Beached bird surveys on Sable Island;
  • Wildlife monitoring for pollution uptake (mussels and fish); and
  • Inspections and audits conducted by CNSOER Conservation Officers.

The CNSOER has a long-standing Memorandum of Understanding with both DFO and ECCC to ensure all environmental considerations are taken into account if potential future operators have interest in the parcel areas.

The Statement of Canadian Practice with Respect to the Mitigation of Seismic Sound in the Marine Environment (the Statement) contains mitigation measures for the potential effects of seismic activity on the marine environment, and is based on the best available science that was available when the Statement was developed. It is currently under review, but the existing Statement remains applicable. 

Adherence to the mitigation within the Statement is required for seismic programs, at a minimum, and enhanced mitigation beyond that stated in the Statement may be required. Potential future operators of seismic operations are to provide rationale for any modifications or variations to mitigation measures that are set out in the Statement, for consideration by the CNSOER.